Migrating fromOpenText?—Get started

Capital Projects · Permitting

File complete
Build to the permit

Each permit is a file of drawings, studies and forms. AODocs checks it before you file, keeps the exact set on record, and ties each condition to its documents.

Works alongside Autodesk Forma, Procore and Oracle Aconex. Your cloud, your storage, your LLM

Before filing

One missing, outdated or contradictory document sends an application back

An application draws on a dozen sources, and each gap the authority finds costs a request, a resubmission and weeks: a superseded study, a missing form, two documents that disagree.

  • Checked against the authority's list before filing.
  • Superseded revisions caught.
  • Documents checked against each other; a person decides.
  • The exact set filed, on record.
Two documents of the same permit application disagree, and a person decides before filingPermit application PA-0219, before filing. Three of its documents state the flare stack height: the application form, revision 2, says 45 m; the environmental assessment EIA-U300, revision 1, says 45 m; the elevation drawing DWG-0310, revision C, says 40 m. The consistency check flags a contradiction on the flare stack height, 45 m in PA-0219 and EIA-U300, 40 m in DWG-0310 revision C. A person decides among Reject, Force and Edit; Edit is chosen by the permitting manager. The drawing goes to revision D with 45 m, revision C is superseded and struck through. The application is consistent and ready to file.PA-0219 · PERMIT APPLICATIONBEFORE FILINGTHREE DOCUMENTS OF THE APPLICATIONApplication formPA-0219 · REV 2FLARE STACK HEIGHT45 mElevation drawingDWG-0310 · REV CDWG-0310 · REV DRev C supersededFLARE STACK HEIGHT40 m45 mDiffersEnvironmental assessmentEIA-U300 · REV 1FLARE STACK HEIGHT45 mCHECKINGContradiction: flare stack height45 m in PA-0219 and EIA-U300 · 40 m in DWG-0310 Rev CDECISIONRejectForceEditEditEdit chosen by the permitting manager: the drawing is corrected.Consistent · ready to file3 OF 3 AGREE

During review

Answer the authority from the set you filed, not from memory

The authority's questions arrive months apart, and each answer must cite the revision filed. In AODocs, each request has an owner and a due date, and is answered from the filed set.

  • Requests and answers linked to the documents filed.
  • Supplementary documents versioned into the permit file.
  • One permit file for engineering, environment and legal.

After the grant

Every condition of the permit reaches the work it binds

A permit condition must reach every drawing and work package it binds. A revision that contradicts it means a finding at inspection, or a stop. In AODocs, each new revision is checked against the permit before approval.

  • Each condition linked to what it binds.
  • Contradictions flagged before approval.
  • Permit modifications versioned; the superseded permit retired.
  • Expiry and renewal dates tracked.
Construction: a change approved once reaches every package

Projects that keep their record straight from the first filing

It's a big risk not to have any document control, that companies don't necessarily see directly, because a lot of time passes between when the document is generated and when the problem happens at the site.
Read the story

Questions on this phase

Can AODocs check our application against the authority's requirements?

Yes. The list of required documents is set per permit type, and the check reads the content of each document, not only its name, before anything is filed. Deciding what the authority will accept remains your team's judgment.

Does AODocs replace the authority's portal?

No. You still file through the authority's portal or channel. AODocs is where the application is assembled, checked and kept, and where the questions and answers that follow are recorded.

We hold dozens of permits across several jurisdictions. Where do we start?

With the permit on your critical path: one permit type on one project, its application set and its conditions. The rest follows the same configuration.

What happens when a new revision contradicts a permit condition?

It is flagged before the revision is approved, with the two conflicting statements side by side. A person decides: reject the revision, force it with a recorded reason, or edit it.

More questions and answers

Find out what would send your next application back

In one hour, we take one permit from your project and show it checked before filing, kept on record, and tied to the work it binds. Bring the last application that came back.

Request a demo

AODocs does not judge regulatory compliance or decide for the authority; it keeps your file complete and consistent.