Enterprise Knowledge Platform for Capital Projects

Control the knowledge.
Accelerate delivery

Drawings, 3D models, contracts, permits, certificates, vendor documents: AODocs brings every project document into one place, one source of truth that AI can trust.

Technical and other project documents, made in-house or received, governed in one AODocs recordSix documents of the same capital project arrive. On one side, technical documents: a 3D model made in-house, a vendor drawing in 2D received from the supplier, and a weld certificate received from the test lab. On the other side, other documents: a contract and a regulatory filing made in-house, and a permit received from the authority. Each document is tagged with its format, 3D, 2D or text, and with its origin, in-house or received. All of them enter one AODocs register for the LNG terminal, unit 300, where each gets a revision and a status written on a stamp: the 3D model, the weld certificate and the permit are in force, the contract and the regulatory filing are approved, the vendor drawing revision C is in review. One lifecycle applies to every document, made in-house or received, and received documents are classified and filed on arrival. AIDA, the AI assistant in AODocs, is asked which revision of vendor drawing VD-K301 is approved and answers from the governed record: revision B is approved, revision C, received from the vendor, is in review, citing its source.TECHNICALOTHER DOCUMENTS3D modelMDL-U300 · REV C3DIN-HOUSEVendor drawingVD-K301 · REV C2DRECEIVEDWeld certificateWC-0412 · REV ATEXTRECEIVEDContractCT-4471 · REV 2TEXTIN-HOUSERegulatory filingEIA-U300 · REV 1TEXTIN-HOUSEPermitPRM-0219 · REV 1TEXTRECEIVEDPRJ-4471 · LNG TERMINAL · UNIT 300AODocs3D model · MDL-U300Rev CIN FORCEContract · CT-4471Rev 2APPROVEDVendor drawing · VD-K301Rev CIN REVIEWRegulatory filing · EIA-U300Rev 1APPROVEDWeld certificate · WC-0412Rev AIN FORCEPermit · PRM-0219Rev 1IN FORCEOne lifecycle for every document, made in-house or received.Received documents are classified and filed on arrival.ASK AIDAWhich revision of VD-K301 is approved?Rev B is approved.Rev C, received from the vendor, is in review.SOURCE · VD-K301 · REV B · APPROVED

Every capital project is now urgent. The record was not built for that.

Data centers wait for power, grids for substations, plants for a turnaround window. Teams must go faster with the same people, and the first thing to give is the paperwork nobody governs.

Millions of documents, governed by hand.

Owner, contractors and suppliers each keep their own copy. Drawings have document control; the rest lives on shared drives and in one person's memory.

Faster means new tools, not more people.

Nobody will staff a 2027 schedule with 2019 document control. The teams that hold their dates check, route and retire documents without anyone having to remember.

Under pressure, your teams will use AI to go faster.
Make sure it reads the right document.

When the schedule is tight, people ask an agent rather than the document controller, and rightly so. The agent finds a signed certificate, misses the one that superseded it, and reports the system complete.

Operations engineer, two days before energizationIs substation feeder 12 cleared for energization?
Agent reading a shared driveYes. Commissioning certificate CC-0412 is signed and dated 14 March.

Revision B, the one in force, sits in another folder.

The agent read a real document. It was not the version in force.

AIDA reads only the approved revision in force, and says so when the answer is not in the record. It removes the largest cause of wrong answers, not every one.

Four moments where the project plan slips. None of them is the model.

Each phase has its moment, and each one turns on a document.

  1. Design and kickoff

    Design and kickoff

    The reference set takes weeks to assemble on a folder tree. In AODocs, the register is imported, numbering and overdue tracking are generated, and a project starts on last month's template in hours.

    The master document register, 2,400 placeholders, 38 overdue

    Design and kickoff
  2. Permitting

    Permitting

    One missing or outdated document sends an application to the back of the queue. In AODocs, it is checked against the authority's list before filing, and the exact set filed stays on record.

    A permit application, two gaps caught before filing

  3. Construction

    Construction

    A permit condition or a revised drawing must reach every work package it affects; missed once, the crew waits. In AODocs, it is linked to those packages, and the superseded revision is retired.

    A variation order with its three linked packages

    Construction
  4. Operations

    Operations

    When something fails, the diagnosis waits on documents. In AODocs, the manual, the drawing and the maintenance record are found in their version in force, and the repair is planned without stopping the plant.

    A work order, with the documents of the diagnosis

Project platforms handle schedule, cost and design well. They were not built for the other documents, and that is where the plan slips.

Go fast without going wrong. Here is what keeps the record straight.

Speed comes from not checking twice: when every team, contractor and agent reads the same version in force, nobody asks which revision is right.

  1. Submission is checked before review.In review

    AI Quality Control checks numbering, revision, metadata and completeness. What fails goes back to the submitter, who sees why.

  2. Status binds rather than advises.In review

    A status is a state of the document, with the roles and evidence each change requires. No new revision while a comment is unanswered.

  3. Review happens in one place, with every party inside.Approved

    Comment sheets reconciled, contractors and suppliers working through controlled portals, human approval where your process puts it.

  4. The superseded revision is retired, demonstrably.Superseded

    Once a revision is approved, the previous one leaves circulation, search and AI.

  5. Everything is on record, for the life of the asset.In force

    Who approved what, when, on which revision; retention per document type; a history that outlives the project team.

One drawing through the five steps that keep the record straightThe drawing P&ID-U300, revision 4, goes through five steps. One: AI Quality Control checks numbering, revision and metadata, finds the title block date missing and returns the submission to the submitter; it comes back complete and enters the review queue, in review. Two: the status binds; comment C-12 has no recorded answer, so a new revision is blocked until the answer is recorded. Three: the owner, the EPC contractor and the valve vendor, through its portal, approve in one place, and the comment sheet is fully answered; the drawing is approved. Four: revision 3 is retired, struck through as superseded, removed from circulation, from search and from AI answers, while revision 4 is in force. Five: everything is on record, with dated approvals and retirement, and retention per document type for the life of the asset.12345Checked before reviewThe status bindsOne review, every partyThe old revision is retiredEverything on recordP&ID-U300REV 3SUPERSEDEDP&ID-U300REV 4FIIN REVIEWAPPROVEDIN FORCEAI QUALITY CONTROLNumberingRevisionMetadataCompletenesstitle block date missingresubmitted, completeReturned to the submitterEnters the review queueSTATUSDraftIn review ← hereApprovedIn forceSupersededComment C-12no recorded answerNew revision blockedComment C-12answer recordedRevision allowedREVIEW · ONE PLACEOwnerapprovedEPC contractorapprovedValve vendorapproved through its portalComment sheet4 comments, 4 answersREV 3 RETIREDOut of circulationOut of searchOut of AI answersON RECORD12 OCT · REV 4 APPROVEDOwner, EPC contractor, vendor12 OCT · REV 3 RETIREDSuperseded by Rev 4RETENTIONPer document typeKept for the life of the asset

Deciding which documents are authoritative is a business judgment we cannot make for you. AODocs provides the platform and the mechanics.

Keep your project platforms. Speed up everything around them.

Autodesk Forma, Procore, Oracle Aconex, Primavera and SAP run design, construction, schedule and purchasing. AODocs governs the documents they produce and consume, for the life of the asset, and replaces the legacy ECM.

CapabilityYour project platformsAODocs
Model coordination, construction management, scheduling, procurementYesPartner
Document governance across every type and phaseLimitedYes
Controlled sharing with external partiesLimitedYes
Retirement of superseded revisions, retentionPartialYes
AI that reads only the version in forceNoYes
Replacement of legacy ECM (OpenText, Documentum, FileNet)Not applicableYes

Integrations with Autodesk BIM 360 and Forma, SAP and Microsoft 365; API-first, on your cloud, your storage, your LLM.

Project platforms remain stronger for schedule, cost, RFIs, submittals, field work and model coordination.

How AODocs works with your project stack

Owners and builders who deliver faster on AODocs.

Before AODocs, it took us weeks to find the right content, and we weren't sure of the quality. Now the process takes minutes and sometimes even seconds, and you're sure it's the right taxonomy and right files every time.

Weeks of document collection down to seconds, data center after data center.

Read the story
It's a big risk not to have any document control, that companies don't necessarily see directly, because a lot of time passes between when the document is generated and when the problem happens at the site.

Setting up AODocs for a new project now takes a few hours.

Read the story

Built for the projects being built now.

  • Data centers

    Hundreds of thousands of documents per campus, hall after hall.

  • Utilities and grid

    Substations, transmission lines and the permits that decide when they energize.

  • Energy and renewables

    Generation, storage, wind and solar portfolios across regions.

  • Oil and gas

    Turnarounds, LNG terminals and the vendor data books behind every certificate.

  • Water

    Treatment plants delivered by Veolia Water Technologies on AODocs.

  • EPC and engineering firms

    One document control standard across every client project.

Questions we hear from teams on a deadline.

Can your AI be wrong?

It can. What AODocs removes is the largest cause of wrong answers on a project record, an invalid source: AIDA reads only the current approved revision, with a valid approval state, and reports when the answer is not in the document base instead of assembling a plausible one. Anyone promising elimination is overselling.

Our project platform already covers document control. Why add AODocs?

It covers the model and the project data well. Ask where the contracts, permits, certifications and transmittal correspondence live, and how a superseded revision is retired in that location. In the evaluations we have run, the general-purpose document record usually sits outside the project platform, on folders and email, and that is where the schedule waits.

We will sort the record out at handover. Why start earlier?

Handover is where the gap surfaces, not where it can be closed. Reconstructing status after the fact costs more than carrying it forward, and the contracts that could have compelled it have expired. Starting narrow, with one document class on the current project or with the next project, is a method, not a shortcut.

Will governance slow the project down?

Ungoverned projects are the ones that lose weeks at kickoff and at handover. Veolia Water Technologies sets up a new project in a few hours and has controlled routing from initiation. Fewer steps, named: no manual numbering, no chasing overdue deliverables by email, no reconciling comment sheets by hand.

More questions and answers

See how much faster one document class can move.

In one hour, we take one document class from your project, a certificate, a permit, a vendor data book, and show it checked, approved, retired when superseded and read by AIDA. Bring the folder it lives in.

Request a demo

Start with the next project, or one document class on the current one. The first project sets the configuration.