Capital Projects · Operations

Find the cause fast
Keep the plant running

When something fails, the diagnosis waits on documents. AODocs puts the manual, the drawing and the last maintenance record in front of your team, in their version in force.

Works alongside Autodesk Forma, Procore and Oracle Aconex. Your cloud, your storage, your LLM

When something fails

The diagnosis waits on documents
The plant should not

An alarm at 2 am: which manual applies to the equipment as installed, what changed, and why? The wrong revision costs more than the delay. In AODocs, search and AIDA answer from the version in force, with its source.

  • Manual and drawing in force, for the equipment as installed.
  • What changed, when, why, and who approved it.
  • Superseded procedures out of search and AI answers.

Before it fails

Preventive maintenance runs on the latest word from the vendor

Vendor bulletins and revised manuals arrive all year, and each can change an interval or a setting. In AODocs, a received document is filed against its equipment and checked against the maintenance plan; a contradiction goes to the reliability engineer.

  • Filed against its equipment on arrival.
  • Checked against plans and procedures in force.
  • A person decides; the decision is recorded.
A vendor bulletin contradicts the maintenance plan, and the reliability engineer decides before the equipment failsCompressor K-301. A vendor service bulletin, SB-K301-07, is received from the vendor and filed against compressor K-301 on arrival: inspect the thrust bearing every 4,000 operating hours. The maintenance plan in force for K-301, MP-K301 revision 3, says every 8,000 hours. The consistency check flags a contradiction on the thrust bearing inspection interval, 4,000 hours in the bulletin received, 8,000 hours in the plan revision 3. The reliability engineer decides among Reject, Force and Edit; Edit is chosen. The plan goes to revision 4 at 4,000 hours, revision 3 is superseded and struck through, and the next inspection moves from March to November.K-301 · COMPRESSORMAINTENANCERECEIVED FROM THE VENDORVendor service bulletinSB-K301-07 · REV 1RECEIVEDBEARING INSPECTION4,000 hFiled against compressor K-301 on arrivalIN FORCE FOR K-301Maintenance planMP-K301 · REV 3MP-K301 · REV 4Rev 3 supersededBEARING INSPECTION8,000 h4,000 hDiffersCHECKINGContradiction: bearing inspection interval4,000 h in SB-K301-07, received · 8,000 h in MP-K301 Rev 3DECISIONRejectForceEditEditEdit chosen by the reliability engineer: the plan follows the vendor.Next inspection: NovemberThe plan in Rev 3 would have waited until March

When the handover had gaps

Most operators inherit a record with gaps
Work with it, and close them

Handover is rarely ideal: a superseded certificate, a missing data book, a scan without status. When the inherited documents enter AODocs, what each says about the same equipment is modelled and compared; contradictions already there are flagged, and each document found later takes its place.

  • Contradictions flagged at the first modelling.
  • Documents on the same equipment brought together.
  • Gaps visible, system by system.

On the next project

The record the project builds is the record the operator runs on

In AODocs, documents do not move at handover: the certificate approved during construction keeps its number, history and approvals; only its owner and access change. AODocs supports the information management requirements of ISO 19650 for the operational phase; it does not confer conformity.

  • Same documents, same history, before and after commissioning.
  • The version in force on any past date.
  • Retention per document type.
Design and kickoff: start the record on day one
A commissioning certificate crosses handover without movingCommissioning certificate CC-0412, feeder 12, during construction: revision A approved, owned by the EPC contractor; the electrical contractor has access, the operations team has none. During commissioning, a retest after a relay change: revision B is approved and in force, revision A is superseded and struck through. At handover on 30 June the certificate does not move: the owner changes from the EPC contractor to the operator, the electrical contractor's access is closed and the operations team's access is opened. Same document, same history; only the owner changed.CC-0412 · COMMISSIONING CERTIFICATEFEEDER 12ConstructionCommissioningOperationsHANDOVER · 30 JUNCC-0412Commissioning certificate, feeder 12 · 33 kVRetest after relay changeRev ARev BAPPROVEDIN FORCENot movedREV ASUPERSEDEDOWNEREPC contractorOperatorACCESSElectrical contractorAccess openAccess closedOperations teamNo accessAccess openedSame document, same history. Only the owner changed.

The record that is there when something fails

Before AODocs, it took us weeks to find the right content, and we weren't sure of the quality. Now the process takes minutes and sometimes even seconds, and you're sure it's the right taxonomy and right files every time.

Weeks of document collection down to seconds, data center after data center.

Read the story
It's a big risk not to have any document control, that companies don't necessarily see directly, because a lot of time passes between when the document is generated and when the problem happens at the site.
Read the story

Questions on this phase

Does AODocs replace our maintenance system?

No. Your maintenance system plans and tracks the work orders; AODocs governs the documents they depend on, manuals, drawings, procedures, certificates, in their version in force, and integrates with SAP.

Our record has gaps. Can we still start?

Yes, and that is the usual case. Start with the documents of your critical equipment: contradictions already in them are flagged when they are first modelled, the gaps become visible, and each document found later takes its place with its status.

We inherit whatever the project gives us. What can we change?

Where the record lives. Ask for it to be kept in your environment from the first deliverable, and handover becomes a change of owner instead of a transfer. On a project already under way, start with the documents you will need first in operation: commissioning certificates, test reports, permits.

What happens to the contractors' access after handover?

It closes when their contract does, without moving a document. Their history stays on record: who submitted what, when, and on which revision they worked.

More questions and answers

See your next diagnosis start from the right document

In one hour, we take one critical piece of equipment from your site and show its documents in force, what changed and why, and how a vendor bulletin is checked against your plan.

Request a demo

AODocs does not replace your maintenance system or your engineers' judgment; it gives them the right document.