Migrating fromOpenText?—Get started

Keep building at full speed through every change

On a live site, change never stops. AODocs links each change to the work packages it binds, retires the superseded revision for everyone, contractors included, and works above the platforms you already run.

Works alongside Autodesk Forma, Procore and Oracle Aconex. Your cloud, your storage, your LLM.

Approve the change once
Every crew it touches works from it the same day

A tighter setback or a moved cable route must reach every package it touches; missed once, it surfaces at inspection. In AODocs, the change is linked to what it binds, and on approval the old revision is retired and its holders told.

  • Linked to its packages and drawings, not filed beside them.
  • Retired on approval, in contractor portals too.
  • Impact recorded: days, cost basis, approver.
One change, approved once, reaches every package and every copyThe cable route drawing 2041-ELE-DWG-0412 is in force at revision C. Variation order VO-017, for permit condition 14, setback increased to 5 metres, arrives in review, then is approved and revises the drawing. Revision D takes the In force stamp; revision C drops below it, struck through and stamped Superseded. The change reaches the three work packages it binds: WP-04 Substation civil, WP-09 Cable routes and WP-12 Protection relays, each turning from Pending to Notified. Last, the copy of revision C held in the electrical contractor's portal is retired, and its holder is told why: superseded by revision D, permit condition 14.VO-017 · CHANGE ON A LIVE SITEPRJ-20412041-ELE-DWG-0412Cable route, feeder 12Rev CRev DIN FORCEREV CSUPERSEDEDVO-017Variation orderPermit condition 14:setback increased to 5 mIN REVIEWAPPROVEDrevisesLINKED WORK PACKAGESWP-04Substation civilPendingNotifiedWP-09Cable routesPendingNotifiedWP-12Protection relaysPendingNotifiedELECTRICAL CONTRACTOR · PORTAL2041-ELE-DWG-0412 · REV CIn useRetiredHolder notified: superseded by Rev D, permit condition 14Approved once. Every package and every copy updated.

Bring contractors inside the process and stop waiting on email

A version sent as an email attachment starts a life of its own at the supplier's. In AODocs, contractors and suppliers work through controlled portals, with the same traceability as your own teams, and their access ends with their contract.

  • Transmittals with a purpose and an acknowledgement.
  • One portal per contractor, limited to its packages.
  • Comments returned on the right revision.

Keep your project platforms
Stop waiting on everything around them

Forma, Procore and Aconex run the model, the site and the drawing exchange well. The contracts, permits, certificates and correspondence around them are where crews wait. AODocs governs those documents under the same lifecycle, and connects to the platforms.

CapabilityYour project platformsAODocs
Model coordination, construction management, scheduling, procurementYesPartner
Other documents under the same lifecycle as drawingsLimitedYes
Document governance across every type and every phaseLimitedYes
Controlled sharing of every document type with external partiesPartialYes
Retirement of superseded revisions, retentionPartialYes
AI that reads only the version in forceNoYes
Same record after handover, for the life of the assetPartialYes
Replacement of legacy ECM (OpenText, Documentum, FileNet)Not applicableYes

Integrations with Autodesk BIM 360 and Forma, SAP and Microsoft 365; API-first, on your cloud, your storage and your LLM.

Project platforms remain stronger for schedule, cost, RFIs, submittals, field work and model coordination.

Projects that start in hours, with contractors inside the process

It's a big risk not to have any document control, that companies don't necessarily see directly, because a lot of time passes between when the document is generated and when the problem happens at the site.

Setting up AODocs for a new project now takes a few hours, and contractors work through controlled portals.

Read the story

Questions on this phase.

Our EPCs work in their own systems. Do they have to switch?

No. Contractors and suppliers keep their own tools. What changes is the exchange: instead of a version leaving as an email attachment, they submit, receive and acknowledge documents through controlled portals inside the AODocs process, with the same traceability as internal users. The superseded revision is retired on their side too, so the copy they hold is visibly the current one.

Do you want to be our common data environment?

AODocs provides the mechanism a common data environment needs: one governed lifecycle for every document type, a status that binds, controlled sharing with external parties, and a record kept after handover. We describe that mechanism rather than claim conformity with a standard. Where your project follows ISO 19650, your information manager defines the containers and states, and AODocs enforces them.

Migrating a live project is out of the question. Where do we start?

Agreed: nobody moves the record of a live project halfway through. Start with the next project, set up from a template in hours, or with one document class on the current project, such as commissioning certificates or permits. The first project is where your document control configuration is defined; every project after it starts from that configuration.

Our project platform already covers document control. Why add AODocs?

It covers the model and the project data well. Ask where the contracts, permits, certifications and transmittal correspondence live, and how a superseded revision is retired in that location. In the evaluations we have run, the general-purpose document record usually sits outside the project platform, on folders and email, and that is where the schedule waits.

More questions and answers

See a change reach every work package

In one hour, we take one change on one of your projects and show it reach every package, contractors included, with the old revision retired.

Request a demo

Start with the next project, or one document class on the current one.